A. Vehicular Access to Site. Within the Corridor, the subdivision of lots along an arterial road shall not be allowed if designed so that each lot has its own individual access to the major road unless approved by the Directors of Engineering and Planning. Each pod of development, or if subdivided, each lot (including out parcels), shall be connected with on-site access to an alley way or interconnecting driveway, rather than directly to the arterial road.
B. Private Roadway/Driveways. Two-way access may be allowed at existing intersections or at new intersections at intervals of 1000 feet only with the approval of the Georgia Department of Transportation and the Directors of Engineering and Planning or their designees for the Columbus Consolidated Government.
C. Interparcel Access. All land parcels, excluding single-family residential, fronting the Corridor right-of-way shall have interparcel connectivity via either an alley way or a travel way that is delineated from parking areas such that short trips between developments can be made without use of the major road within the corridor. Within a focus area, development shall interconnect with the road or travel way network of any adjacent development or site within the focus area unless the Directors of Engineering and Planning determines such connection would constitute an undue hardship.
D. Sidewalks. Sidewalks shall be required as established under Chapter 7, Article 10 of the Unified Development Ordinance and shall be adjacent to all non-limited access public rights-of-way. Sections along 2nd Avenue between 35th street and 38th street shall not be less than 8 feet in width.